COILCO
HORIZONTAL TUBE END FORMER
Produces specially shaped tube ends
precisely and economically.
The COILCO HORIZONTAL TUBE END FORMER is a highly productive unit designed to produce industry standard or special connections for tube ends. This automatic cycling, hydraulically powered machine operates as a double-stroke machine with alternating tool stations which allows a wide variety of end forming not possible with a single-form tool. The control section also allows you to set it for single form jobs that do not require two hits.

O’Ring, Open Bead, Close Bead, Single Flare
Double Flare Bell, Swage
Custom Shapes Available
The unique design of this machine allows fast change over from one tube end configuration to another. The tube stop is movable and may be reset in a few moments. Total time for change over is approximately 10 minutes.
COILCO
AUTOMATIC TUBE END FORMER
Form ends of straight or bent tube parts and
bend ends of straight tubes.
COILCO’S AUTOMATIC TUBE END FORMER produces from 1200 to 1400 units per hour of precise, burr-free, quality parts from tubing fed from a vibrating hopper containing your pre-cut lengths.

Initial loading is accomplished by filling the hopper. Operation is then automatic until a change in part length, tube end shape or O.D. is required.
The machine is supplied with tooling to handle one size O.D. tube and three different length pusher mandrels. The pusher ram has 1" of length adjustment, thus changing pusher mandrels covers any length range. Tooling consists of clamp blocks and a forming mandrel. A wide variety of tube end configurations may be produced.
Saddle, Saddle Bead, Close Bead, Bell
Swage, Open Bead, Single Flare
FEATURES
Bending and end forming in one operation.
No burrs.
1200 to 1400 parts per hour.
Large capacity hopper holds up to 2,000 precut tubes.
Handles steel, copper and aluminum tubes from 5/16" through 1/2" O.D.
Produces shaped tube ends and tubes up through 3" long.
Precision made tooling to insure close tolerance parts.
Interchangeable mandrels for varying tube diameters.
Produces tube bends up to 90° using special clamp blocks.
Counter stops machine cycle when selected number of parts are complete.
Tooling change takes about 15 minutes, O.D. change about 45 minutes.